Kinson WRC at Bournemouth

Kinson WRC at Bournemouth has become the third Liquid Lime Dosing Plant to be supplied, this contract was managed by Trant Engineering Ltd. The plant was specified to meet the client’s needs for their requirement to provide sufficient alkalinity for nitrification.

The plant was intrinsically similar to the Taunton Ham and Thornford Lime Dosing Plants and only required adapting to the site-specific layout and dosing rates required at Kinson. This involved some changes in the makeup of the lime solution and flow rates resulting in changes to the software, but instrumentation and control remained pretty much the same. The plant layout also changed allowing for the allocated footprint for the plant and access for maintenance.